May 2005
|
All columns of 3 rd sty at Sectot ”B” completed and formwork and rebar work leading to 3 rd sty in progress. |
|
|
May 2005
|
The M&E Workers are doing installation of pipe sleeve for plumbing & sanitary and laying conduits for electrical works. |
|
|
July 2005
|
Casting of 3rd sty Podium ( Car-Park ) Slab in Progress |
|
|
July 2005
|
Construction Joints at beams and slab are properly placed using hyrib material with proper support. |
|
|
July 2005
|
The Concrete Pump is pouring concrete to the Column Cap at CB-13 of Sector “A “ at Transfer Plate. |
|
|
July 2005
|
The Surveyor is doing setting out lines for Stair-Case “1” and some other grid lines at 3rd sty Slab. |
|
|
July 2005
|
Casting of Plinths for Coling Tower at 2nd Sty
is being done.
|
|
|
July 2005
|
Laying of Electrical Conduit of new mail box area at 3rd sty slab is in progress. |
|
|
July 2005
|
Erection of formwork for slab recess area due to M&E Services is completed at Sector “A” of Transfer Plate. |
|
|
July 2005
|
Internal Scaffolding are being erected according to the temporary work designed and P.E will inspect internal/cantilever platform before 1st cast of Transfer Plate. |
|
|
July 2005
|
Column Starter bar ( Type: C3 ), have been planted next to M&E pipe sleeves as per approved drawings. |
|
|
July 2005
|
Bottom reinforcement at slab recess area of Sector “A” has been completed. |
|
|
July 2005
|
Formwork erection of Sector “C” is partially completed and Supervisor is using level instrument to check formwork is correct within tolerance. |
|
|
July 2005
|
The removal of loose concrete is being done at Column cap before laying of reinforcement at Transfer Plate. |
|
|
July 2005
|
Preparation work for UB installation of temporary cantilever platform next to Service Lift at 3rd sty in progress. |
|
|
July 2005
|
Rebar, formwork & casting of columns at Swimming Pool area in progress. |
|
|
July 2005
|
Testing Specialist is doing UPV test of CB-10 at 2nd Sty witness by Prof: Dr. Dias, Mr. Stephan & Mr.Dillip of AHPL, Mr.Kumudu & Mr. Indrajith of PA and SPACE Staffs. |
|
|
July 2005
|
Prof: Dr. Dias is recording the readings from UPV Test for his analysis for quality of Concrete. |
|