Date
Description
View
     
September 2005
80% of laying top reinforcement T-1, T-2, T-3 & T-4 ( four layers ) are completed at Sector” A “.
Sptember 2005
Good rough concrete surface is seen after being completed of cleanliness prior to lay top reinforcement at Sector “A”
September 2005
Fabrication of system column formwork for typical floor are being done.
September 2005
The final layer cast of Transfer Plate at Sector ”A” in progress.
September 2005
The steel fixers are busy tying of top reinforcement bar at Sector ”B” Transfer Plate to cast the slab on schedule.
September 2005
Installation of M&E Pipes connecting to Cooling Tower at B-1 High Level has been completed.
September 2005
Installation of Cooling Tower & Make up water tank are ready for (T&C ) prior to start operation.
September 2005
85% of final cast for entire Transfer Plate has been completed.
October 2005
Erection of wall rebar for strengthening work has been done from Basement -1 to 1st Storey and form work in progress.
October 2005
Dismantling of staging and formwork of Transfer Plate at Sector “C” has been partially completed, and good quality of concrete surface without having honeycomb is seen.
October 2005
Proper safe stripping of formwork is being carried out at Sector “A” of Transfer Plate without causing floor damages at 3rd sty which has been done with power float finish.
October 2005
The Steel fixers are busy rushing to complete the laying of rebar at Sector “B” prior to final cast of entire Transfer Plate.
October 2005
The cleanliness of 1st cast concrete surface, final touch up work for shear links & columns/walls starter bar before proceeding to erection of top reinforcement bar are being done.
October 2005
The R.C stair-case walls have been cast by using “ Doka climbing formwork system which gives safe, quick and easy work done during operation one floor to another at any height.
October 2005
Our Supervisor is doing (as-built ) site measurement of Passenger Lift Shaft after cast, using Doka System formwork, ensuring to achieve structural clear opening with good verticality.
October 2005
The Service Lift has been cast from 5th to 6th sty and erection of formwork & rebar ( 6th to 7th floor ) are being carried out.
October 2005
The fabrication of “Aluma Tableform system” for beam and slab (Typical Floor ) which performs the work safely and efficiently is in progress.
October 2005
Pre-fabrication column is used to expedite the work on site so that we can catch up the cycle time as per schedule.
October 2005
The new Cooling Tower is now in operation, serving the existing Shopping Mall.
October 2005
It was found that good quality of concrete without having any defects at Wall W-8 at 6th story after dismantling of formwork
October 2005
Doka wall form systems, being used are seen with high standards of safety
November 2005
6th Sty Slab ( Sector-A ) has been cast and Columns setting out lines are being carried out.